What New Residential Projects Are Currently Under Construction Along the Dwarka Expressway Corridor in Gurugram and When Are They Expected to Deliver Possession

By SOMIK SHARMA

September 29, 2026 · 13 min read

The Dwarka Expressway corridor in Gurugram is one of the most active residential construction zones in the entire National Capital Region right now, with dozens of projects from major developers in various stages of completion. If you are trying to figure out what new residential projects are currently under construction along the Dwarka Expressway corridor in Gurugram and when they are expected to deliver possession, this guide breaks it all down by sector, developer, configuration, price band, and expected handover window. Whether you are buying your first flat or adding to a portfolio, understanding the construction pipeline here is essential before you commit.

What New Residential Projects Are Currently Under Construction Along the Dwarka Expressway Corridor in Gurugram and When Are They Expected to Deliver Possession

1. Why the Dwarka Expressway Corridor Has Become a Construction Hotspot

The Dwarka Expressway corridor is now the most densely active residential construction zone in Gurugram. The full operationalization of the 29-kilometre elevated expressway connecting Sheetla Mata Road in Gurugram to Dwarka Sector 21 in Delhi fundamentally changed how developers and buyers think about this stretch. Travel time from Sectors 99 to 113 in Gurugram to Indira Gandhi International Airport dropped to roughly 20 to 25 minutes under normal traffic conditions, and the connection to NH-48 made the entire belt more accessible than it had been at any point in the previous decade.

According to JLL India's analysis of the Dwarka Expressway and New Gurugram cluster, this corridor has emerged as one of the most significant residential micro-markets in the NCR, driven by infrastructure completion, proximity to the airport, and a large inventory of under-construction supply across multiple price points.

The Infrastructure Trigger

The expressway's completion was the single largest catalyst for new launches on this corridor. Before the elevated section opened, the stretch between Kherki Daula toll and Dwarka was notorious for congestion. Once that bottleneck was resolved, developers who had been sitting on land parcels along Sectors 99 through 113 accelerated construction timelines and launched new phases. The Haryana Rapid Metro's proposed extension toward this belt has further reinforced developer confidence in the zone.

What the Corridor Covers Sector by Sector

The Dwarka Expressway residential corridor in Gurugram spans roughly from Sector 76 in the south to Sector 115 in the north, with the highest concentration of active construction in Sectors 99, 102, 103, 104, 106, 108, 109, 110, and 113. Each sector has a distinct character in terms of plot sizes, tower heights, and the mix of developers present. Sector 102 and 103, for instance, host several large-format luxury towers with floor plates above 3,000 square feet, while Sector 99 and 106 carry more mid-segment inventory with 2 BHK and 3 BHK configurations in the 1,200 to 2,000 square foot range.

2. Major Projects Currently Under Construction: Developer by Developer

As of September 2026, the list of active construction projects along the Dwarka Expressway corridor in Gurugram is substantial. The projects below represent the most significant ones currently in various stages of structural work, finishing, or pre-handover snagging. Possession timelines cited here are based on RERA-registered completion dates; always verify the current status on the Haryana RERA portal before making a booking decision.

DLF, Sobha, and Signature Global

DLF's presence on the expressway is anchored by its Privana series in Sector 76 and Sector 77. DLF Privana West and DLF Privana South, both in Sector 76 and 77 respectively, are under active construction as of September 2026. These are large-format luxury residential towers offering 4 BHK configurations starting around 3,500 square feet. DLF Privana South, which sold out its initial inventory within days of launch in early 2024, is currently in the structural completion phase for its lower floors, with possession expected in phases between late 2027 and 2028. Buyers who purchased in the initial tranche should be receiving possession communication in late 2027 if construction stays on schedule.

Sobha Limited has an active project in Sector 106 called Sobha Aranya. This is a plotted development spread across a large land parcel, with villa and independent floor options. Construction of internal infrastructure, roads, and utilities is ongoing. RERA-registered timelines for Sobha Aranya place possession in phases starting from mid-2027. Sobha's track record in Gurugram, particularly from its earlier projects in Sector 108, has been closely watched by buyers who are aware the developer has generally delivered within reasonable proximity to committed timelines.

Signature Global is one of the most active developers on the Dwarka Expressway corridor right now. Its projects span multiple sectors and price points. Signature Global City 37D Phase 2 in Sector 37D is an affordable-to-mid-segment project with 2 BHK and 3 BHK units in the 650 to 1,100 square foot range, priced broadly between Rs 60 lakh and Rs 1.2 crore. Possession for earlier phases was delivered in 2025, and Phase 2 towers are targeting possession in 2026 to early 2027. Signature Global's Titanium SPR in Sector 71 and its Signum 37 commercial components are also under construction, though those are commercial rather than residential.

Godrej, M3M, and Elan

Godrej Properties has an active residential project in Sector 103 called Godrej Tropical Isle. This is a high-rise luxury project offering 3 BHK and 4 BHK apartments with carpet areas ranging from approximately 1,800 to 2,800 square feet. The project is in structural work phase for its upper floors as of September 2026, with RERA possession timelines pointing toward late 2027 and into 2028 for different towers. Pricing at launch was in the range of Rs 2.5 crore to Rs 4.5 crore, and secondary market prices have moved upward since the launch phase closed.

M3M India is constructing multiple projects along the corridor. M3M Capital in Sector 113 is one of the larger ongoing projects, offering studio, 1 BHK, 2 BHK, and 3 BHK configurations with a mix of residential and serviced apartment components. Structural work on the towers is at an advanced stage, and the developer has communicated possession timelines for initial towers starting in late 2026, with subsequent towers in 2027. M3M Antalya Hills in Sector 79 is another active project with 3 BHK and 4 BHK units; possession is expected in phases from 2027 onward.

Elan Group's Elan The Emperor in Sector 106 is a luxury residential project that has attracted significant attention. The project offers 4 BHK and penthouse configurations with large floor plates, positioned at the higher end of the Dwarka Expressway market. Construction is in progress, with possession expected in 2027 to 2028. Elan has also launched Elan Imperial in Sector 82, which is in earlier construction stages with possession expected in 2028.

Smaller but Notable Launches

Beyond the headline names, several mid-sized developers are also active on the expressway corridor. Adani Realty's Adani Samsara Vilasa in Sector 63A is under construction with 3 BHK and 4 BHK villas and floors; possession for initial phases is expected in late 2026 to early 2027. Whiteland Corporation's Westin Residences in Sector 103 is a branded residences project in construction, targeting a 2027 to 2028 possession window. For a broader picture of active launches and project listings on this corridor, the Dwarka Expressway New Projects portal aggregates current listings, configurations, and developer contact details across the belt.

3. Possession Timelines: What to Realistically Expect

RERA-registered possession dates are the legal baseline, but actual delivery often runs 6 to 18 months beyond that date. This is not unique to Dwarka Expressway projects; it reflects broader patterns across Gurugram's under-construction market. The Haryana RERA portal lists every registered project, its committed possession date, and any extensions that have been formally granted. Checking this before booking is non-negotiable.

RERA-Registered Deadlines vs. Actual Delivery

Projects that launched between 2019 and 2021 and are still under construction in September 2026 have already received one or more RERA extensions. This includes several towers in Sectors 99, 102, and 108. For projects launched after 2022, construction timelines have generally been tighter because developers priced land and materials at post-pandemic costs, reducing the risk of mid-project financial stress. Projects launched in 2023 and 2024, such as DLF Privana South and Godrej Tropical Isle, are currently on track relative to their registered timelines, though buyers should build in a buffer of at least six months when planning their own move-in or rental exit.

Here is a summary of the broad possession window by project category as of September 2026:

  • Late 2026 possession (imminent): Signature Global City 37D Phase 2 (select towers), M3M Capital Sector 113 (initial towers), Adani Samsara Vilasa Phase 1.
  • Mid to late 2027 possession: DLF Privana South (initial floors), Sobha Aranya Sector 106, Godrej Tropical Isle Sector 103 (earlier towers), M3M Antalya Hills Sector 79.
  • 2028 possession: DLF Privana West (later towers), Elan The Emperor Sector 106, Whiteland Westin Residences Sector 103, Elan Imperial Sector 82.
  • 2029 and beyond: Projects launched in 2025 and 2026 with 4 to 5 year construction cycles, including several new Signature Global and Sobha phases announced this year.

How to Verify Construction Progress Yourself

A site visit is the most reliable way to assess where a project actually stands. Look at how many floors are structurally complete on your specific tower, whether finishing work (plastering, tiling, electrical conduit) has begun on lower floors, and whether the clubhouse and common areas are taking shape. A project where structural work is complete on all floors but finishing has not started is typically 12 to 18 months from handover. A project where finishing is underway on the lower 10 floors is likely 6 to 12 months out for those floors.

Beyond the site visit, cross-check the Haryana RERA portal (hrera.org.in) for the project's registered completion date, the number of units sold versus total, and any formal extension orders. Also look at the developer's quarterly construction update emails or WhatsApp group posts if you are already an investor, and compare those claims against what you see on site. Discrepancies between marketing communications and actual site progress are a useful signal.

4. Pricing, Configurations, and What Your Budget Gets You

The Dwarka Expressway corridor now covers one of the widest price ranges of any micro-market in Gurugram, from under Rs 60 lakh to upward of Rs 10 crore in the same geographic stretch. Understanding what each segment looks like in terms of actual square footage, floor count, and amenity quality helps you compare projects accurately rather than relying on marketing descriptions alone.

Entry-Level to Mid-Segment Options

In the Rs 60 lakh to Rs 1.5 crore range, the dominant product on the expressway corridor is the 2 BHK and compact 3 BHK apartment in sectors like 37D, 99, and 106. Carpet areas typically run from 600 to 1,200 square feet. Signature Global, Raheja Developers, and a few regional builders operate in this band. These projects tend to be high-density, with towers of 25 to 35 floors on plots that also include a clubhouse, swimming pool, and landscaped areas. The trade-off is that common areas and finishes are functional rather than premium.

The mid-segment, broadly Rs 1.5 crore to Rs 3.5 crore, is where the largest number of new projects are concentrated right now. This includes 3 BHK units of 1,500 to 2,200 square feet and 4 BHK units at the upper end of this range. Developers like M3M, Godrej (select configurations), and Adani Realty operate here. These projects typically offer larger clubhouses, multiple sports courts, concierge services, and more generous landscaping ratios. For context on how per-square-foot pricing in Gurugram's mid-segment compares across sectors, the article on apartment prices per square foot in Sector 57 Gurugram provides a useful benchmark for how pricing logic works across the city.

Luxury and Ultra-Luxury Segment

Above Rs 3.5 crore, the Dwarka Expressway corridor has seen a sharp increase in luxury and ultra-luxury launches since 2023. DLF Privana South and West, Elan The Emperor, Whiteland Westin Residences, and Godrej Tropical Isle (upper configurations) all sit in the Rs 3.5 crore to Rs 10 crore-plus band. These projects offer floor plates of 2,500 to 4,500 square feet, private lift lobbies, double-height living rooms, and amenity decks with features like sky lounges, golf putting greens, and co-working spaces. The shift toward larger, well-appointed units reflects a broader pattern across Gurugram's new construction market in 2026.

If you are evaluating your overall budget and financing options for any of these projects, the complete buyer's guide to the Gurugram market in 2026 covers home loan eligibility, builder-buyer agreement clauses to watch for, and the documentation process in detail.

5. Key Buyer Considerations Before Booking on the Expressway

Booking a flat in an under-construction project on the Dwarka Expressway corridor requires more than comparing brochures and show-flat impressions. There are specific connectivity, legal, and financial factors unique to this corridor that every buyer should evaluate before signing the builder-buyer agreement.

Connectivity and Commute Reality

The expressway itself is fast, but last-mile connectivity within sectors is still developing. Sectors 99 through 113 are not yet served by metro rail as of September 2026. The nearest metro stations are at Sector 101 and Sector 110A on the Delhi Metro's Green Line extension, but those are still a short auto or cab ride from most project gates. If you commute to Cyber City or Udyog Vihar daily, factor in that the expressway entry and exit points can back up during morning peak hours, particularly at the Kherki Daula toll and the Sheetla Mata Road junction. A realistic commute from Sector 106 to Cyber City is 35 to 50 minutes on a typical weekday morning.

Social infrastructure is improving but still maturing in the northern sectors. Sectors 102 to 115 have several operational hospitals, including Marengo Asia Hospital in Sector 56 and Artemis Hospital accessible via NH-48, and a growing number of retail and dining options along the Southern Peripheral Road and within mixed-use developments on the expressway itself. Grocery chains, pharmacies, and daily-need retail are present but not as dense as in established sectors like 56 or 57.

Due Diligence Checklist

Before you book any under-construction project on this corridor, work through the following checks:

  • RERA registration: Confirm the project is registered on hrera.org.in and check the registered possession date, the number of extensions already granted, and the total number of units in the project.
  • Land title clarity: Verify that the developer holds a clear title to the land and that the licence number issued by the Town and Country Planning Department of Haryana is valid and active.
  • Construction-linked payment plan vs. time-linked: Construction-linked plans tie your payments to actual construction milestones, which is less risky than time-linked plans where you pay on a calendar schedule regardless of progress.
  • Escrow account compliance: Under RERA, developers must deposit 70% of collections into a dedicated escrow account. Ask the developer for confirmation that this is being maintained and check the RERA portal for any complaints filed against the project.
  • Carpet area vs. super built-up area: RERA mandates pricing on carpet area. Confirm the carpet area of your unit in writing, as loading factors on the expressway can range from 25% to 45% depending on the project.
  • Possession delay compensation clause: The builder-buyer agreement must include a compensation clause at the RERA-prescribed rate (currently the State Bank of India's MCLR plus 2%) for delays beyond the committed possession date.

The Dwarka Expressway corridor is genuinely one of the most active and consequential residential construction zones in Gurugram right now, and the range of projects under construction means there is a product for almost every budget. But the sheer volume of options also makes it easier to make a poorly informed decision. Knowing which projects are under construction along the Dwarka Expressway corridor in Gurugram and when they are expected to deliver possession is only the starting point; the due diligence layer is what separates a sound purchase from a stressful one.

FAQ

Which Dwarka Expressway projects in Gurugram are closest to delivering possession in late 2026?

As of September 2026, the projects nearest to possession handover on the Dwarka Expressway corridor include select towers of Signature Global City 37D Phase 2 in Sector 37D, M3M Capital's initial towers in Sector 113, and Adani Samsara Vilasa Phase 1 in Sector 63A. These projects have either completed structural work or are in advanced finishing stages. Buyers who are close to possession should verify their specific tower's status directly with the developer and confirm the Occupancy Certificate application has been filed with the relevant municipal authority, as possession cannot legally be handed over without it.

How do I check if an under-construction project on the Dwarka Expressway is RERA-compliant?

Visit the Haryana RERA portal at hrera.org.in and search by project name or developer name. The portal shows the project's registered possession date, any extensions formally granted, the total number of units, and complaints filed by existing buyers. You should also check that the project's licence number issued by the Haryana Town and Country Planning Department is current. If a project is not listed on the RERA portal or its registration has lapsed, that is a serious red flag and you should not book until the issue is resolved. A local real estate expert familiar with the Gurugram market can help you interpret what you find on the portal.

Is it better to buy a ready-to-move flat or an under-construction project on the Dwarka Expressway right now?

Both options have real trade-offs specific to the Dwarka Expressway corridor in September 2026. Ready-to-move flats eliminate construction and possession risk, and you can physically inspect the unit, the building quality, and the actual amenities before committing. However, ready inventory on the expressway is limited and priced at a significant premium over under-construction rates, often 15% to 25% higher for comparable configurations. Under-construction projects offer lower entry prices and the ability to choose your floor and unit, but require you to manage EMI plus rent simultaneously for the construction period and carry the risk of delays. The right choice depends on your financial position, your current housing situation, and how long you can afford to wait for possession.

LET'S FIND THE RIGHT FIT

Whether you're buying, selling, or simply exploring your options — the right guidance makes all the difference. Let's start a conversation.

BE THE FIRST TO KNOW

Stay ahead with early access to new listings, market shifts, and insights that help you make more informed decisions over time.

SOMIK SHARMA

OFFICE

GURUGRAM

CONTACT INFORMATION

gravitylandbase@gmail.com

About|

Equal Housing

© 2026 SOMIK SHARMA. All Rights Reserved.

POWERED BY

TROLTO